7 Alden Avenue, Toronto, Ontario M8Z 1C4

Marine Pipe Installation Projects

Our highly skilled team can carry out your piping and steel construction projects quickly and professionally.

Year Description Location Client
2017 Outfall pipe Penetanguishene Kenaidan Contracting Ltd
2016 raw water intake Slate Falls Kingdom Construction Ltd
2015-16 Lake Huron intake removal Camp Ipperwash, Ontario
2015 pipe protection upgrade Madawaska River Town of Arnprior
2014-15 cleaning intake pipe Grimsby, ON Regional Municipality of Niagara
2014 110m of 300mm HDPE water intake Serpent River, ON Tribury Construction (1995) Inc
2014 2800m of 150mm HDPE carrier,1600m of 50mm HDPE watermain, 1600m of 50mm HPDE forcemain Pinawa, Manitoba Don Sikora Construction
2012 120m of 150mm HDPE forcemain Lagoon City Township of Severn
2011 440m of 400mm HDPE water intake Wasauksing First Nation WTP Kingdom Construction
2010 85m of 1400mm HDPE DR21 sewer pipe Town of Arnprior North America Construction(1993) Ltd
2008 169 metres 900mm water intake Leamington Leamington Area Drip Irrigation Inc
2008 200mm 450mm Forcemain Parry Sound Fowler Construction Company Ltd
2008 35m of 600mm Twin intakes Lindsay, ON Peak Engineering
2007 280 meters 600mm water intake Craigleith Craigleith Ski Club
2007 900 meters of 63” Raw water intake Barrie City of Barrie
2006 950m of 300mm Intake, 850m of 300mm Outfall Lake Couchiching Township of Severn
2006 70 meters twin 350mm water Intake Lakefield Balterre Contracting
2005 900 meters 600mm water intake Georgian Bay Georgian Peaks Club
2005 210 meters 200mm water intake Balsam Lake Ron Robinson
2005 60 meters 300mm Kinmount W.G. Jacket
2005 350 meters 350mm water intake Sydenham Township of Frontenac
2005 4-1590 meters 50mm water intake Lorne Park W.A.Stevenson
2004 385 meters 250mm, 182 m 300mm Outfall, 185 m 250 mm Force main, 185 m 150 mm Sanitary Main Baysville Maple Engineering
2003 220 meters twin 100mm Balsam Lake Nortuck Contracting
2003 repair 50 meters 350mm Orillia Stepan Canada
2002 750 meters 1500mm intake Burlington McNally Construction
2002 165 meters 450mm outfall Toronto City of Toronto
2002 160 meters 500mm intake Collingwood Hadovic Construction
2002 150 meters 200mm intake Lake Joseph Club Link Corporation
2001 60 meters 100mm backwash Rama Maple Engineering
2000 200 meters 760mm Intake Parry Sound Kenadian Contracting
2000 200 meters 400mm Intake Lake Rosseau Muskoka Woods Resort
1999 250’ 16” Water Intake Little Current Pederson Construction
1999 750’ 12” Water Intake South River Peak Engineering
1999 2-150’ 16” Water Intake Lake Joseph Club Link
1999 triple inverted siphon, 60 meters 350mm, 450mm, 500mm Lindsay Peak Engineering
1999 150’ 6” Intake Pipe Lake Muskoka Aston Resort
1998 3200 meters 12” and 18” Intake and Outfall Echo Bay Penn-Co Construction
1997 2,536 meters of 2100mm water intake (diving only) Ajax Canadian Dredge & Dock
1997 37.5meters 400mm intake Cobalt Grant Paving
1997 121meters 200mm outfall, 75 meters 150mm intake Magnetawan Fowler Construction
1996 235 meters 1200mm outfall pipe (diving only) Kingston Canadian Dredge & Dock
1996 1840’ of 10” outfall Rama Chippewas of Mnjikaning
1996 150 meters 600mm water intake Espanola Bennett Mechanical
1996 355 meters 350mm intake, 60 meters 350 mm outfall, 166meters 350,300,150 river crossing Port Severn C.M. Diepede
1995 40 meters 400 mm Diffuser Replacement Beaverton Maple Engineering 40 meters 400 mm Diffuser Replacement Beaverton Maple Engineering
1995 380 meters Water Intake Innisfil Town of Innisfil
1995 142 meters 700mm Outfall Napanee City of Nappanee
1994 720’ of 10” Water Intake Mactier Kenadian Contracting
1994 triple inverted siphon, 86 meters 500mm, 406,114mm Bracebridge Fowler Construction
1994 450 meters of 200mm water intake Richards Landing Bennett Mechanical
1994 85 meters 400mm watermain crossing Muskoka river Bracebridge Fowler Construction
1993 650 meters 150mm water intake Sheguiandah Bennett Mechanical
1993 400 meters 900mm water intake Bracebridge C.M.Diepede Construction